赤峰附近有没有服务

Welcome to the website of Shandong yechuang Experimental Equipment Co., Ltd! The company to stress integrity, quality management purposes, advanced technology, quality services to provide users with accurate, reliable, durable quality products.

 "Shandong industrial innovation experimental equipment"

Expert team, quality assurance and after sales service Solution provider

Yechuang is willing to work with you to create the world's high-end laboratory

National free hotline eighteen billion nine hundred and five million three hundred and one thousand six hundred and eighty-nine

Laboratory furniture: installation steps of steel wood experimental platform

Source: unknown popularity: Time of publication: 14:59, August 27, 2020


 
The first step : observe the front and side of the frame. The joints of all steel frame beam square pipes shall not be welded on the visible surface. Mark the height of the cabinet on the steel frame or make a fence with the same height as the cabinet body.
The second step: according to the total length, select the appropriate beam, and fix the beam on the steel frame with self tapping screws (the steel frame cannot be directly placed on the uneven ground, it should be slightly paved, and the joint between the beam and the steel frame should be horizontal, and its position will affect the level of the table and the gap thickness between the extraction surface and the beam. Pay attention to the parallelism between beams when tightening.

 
Step 3: check whether the horizontal line and vertical line of the steel frame are horizontal with a level ruler, and adjust the supporting feet to meet the requirements.
Step 4: the hanging cabinet can only be hung under the premise of ensuring the level. The two methods of horizontal and vertical steel frame hanging cabinet are basically similar.
 
(1) Screw the joist on the steel frame to the height of hanging on the cabinet, then put it into the cabinet, connect each cabinet with 4 * 30 screws, push the two ends of the cabinet down to make it flush with the two ends of the steel frame, and tighten the nut of the joist with a wrench to make it fully stressed;
(2) Install the side seal plate and fix it with a small right angle and screws. Silicone is not recommended.
Step 5: install the drawer with slide rail into the cabinet, and drill four holes on the top of the 4mm twist drill on the drawer. The distance depends on the width of the drawer
(1) Install the drawer panel, drill 4 * 30MM screws from the reserved holes on the back to find the correct position;
(2) Install the door panel;

 
Installation requirements of cabinet suction surface and door panel:
(1) The gap of all doors should be uniform and uniform, and the gap should be 2mm, and the crossing position of horizontal line and vertical line should be good;
(2) The vertical plane of door panel and drawing surface can be checked by long straight bar.
(3) Whether the drawer is pulled smoothly and whether there is abnormal sound. If the drawing is not smooth, there may be two reasons:
First, the slide rail position on the cabinet side panel is not correct; second, the screw is not straight.
(4) When opening and closing, the door panel will not collide with all sides. The hinge screws must be tightened to prevent the door panel from falling off.
Step 6: the steps and requirements for bonding the table top are the same as for all steel. In steel and wood structures, the extraction surface is usually installed first, and then the desktop is installed. If a reagent rack is installed on the table, the installation will be carried out after the glue has solidified.

laboratory Furniture equipment scanning consultation

Ranking of similar articles

Latest news articles